PR 402 — Abu Dhabi Lighting Manual: Key Points & Actionable Guidance

  1. Design Stage Submission: Photometric analysis (IES files), BUG ratings, and CCT declarations must be submitted to DMT for "No Objection Certificate" (NOC).
  2. Pre-commissioning Testing: On-site lux measurements at 100+ grid points; verification of curfew dimming schedules via DALI or 0–10V logs.
  3. As-Built Certification: Signed off by a DMT-approved lighting consultant. Non-compliance results in fines, mandatory retrofit, or denial of building completion certificate.

2.1 Illuminance Levels (Lux Tables)

Whether you are designing a parking lot in Musaffah or a tunnel on Sheikh Zayed Road, always start with PR 402. Download the latest version from the Abu Dhabi Municipality ePortal, calibrate your software to its parameters, and when in doubt, consult the municipality’s lighting helpdesk.